Initiative to install a heat pump at the sewage treatment facilities of Mosty city (Mosty branch of the Belarusian Public Association of Disabled)

The launch seminar of the Mosty branch of the Belarusian Association of Persons with Disabilities was held in Mosty.

Buildings near the wastewater treatment plant of Mosty city before thermo-renovation and transfer to heating due to the heat of sewage

The transfer pump pumps sewage with high temperature

The implementation of the initiative “Reducing greenhouse gas emissions by installing a heat pump at the sewage treatment plant in Mosty city ” will install equipment for recovering heat from wastewater, which will allow this heat to be used to heat the buildings of Mosty Municipal Housing and Services Organization located near the wastewater treatment plant of the city of Mosty. The transfer of the heating system of these buildings to the use of heat from sewage will help turn off the boiler house operating on solid fuel (wood and briquette) and reduce the burning of firewood, which means CO2 emissions.

Wastewater Treatment Facilities, Mosty city

Laboratory control of wastewater quality in Mosty city

Добавить комментарий

Ваш e-mail не будет опубликован. Обязательные поля помечены *